micro:bit · Get coding ↗
Start with events, buttons and a display using the official MakeCode simulator.
Try basic programs in the browser first; physical downloads, peripherals and robot extensions have separate requirements.
www.microbit.orgZEPHASTRA COMMUNITY
Documentation, open-source tools and practical references.
Use a simulated capture to find missing frames, duplicates, and invalid action labels.
OFFICIAL DOCUMENTATION
Find references by task, then confirm versions and runtime requirements.
These are official links and usage notes, not republished documentation or claims that tutorials were executed.
Start with events, buttons and a display using the official MakeCode simulator.
Try basic programs in the browser first; physical downloads, peripherals and robot extensions have separate requirements.
www.microbit.orgExplore simulated buttons and sensor input for most micro:bit programs.
Not a full robotics dynamics simulator; it does not verify wiring, motors or driving behavior.
makecode.microbit.orgExplore apps, editions, SDK and simulation documentation.
Distinguish Wireless, Lite and Simulation; check each app’s model services, accounts and computer requirements.
huggingface.coOfficial ros2_tracing repository for execution events and performance investigation. Not run in this editorial review.
Architecture documentation from a fixed public project revision. Original project documentation may be in Chinese.
Public task reports, camera evidence and cancellation checks. These are not cross-device or real-hardware certification.
The November 16 announcement includes standards on intelligence grading, training, powered joints, and dexterous hands.
On November 19, Marubun announced a RealMan distribution agreement covering lightweight arms, data collection, and plans to mount arms on quadrupeds.
The official examples cover a basic model, PID, transmissions, and a mobile base.
Use the controller docs to distinguish commands, execution status, and hardware interfaces.
On November 17, Novares reported 200 cycles in one hour of autonomous operation during a Spanish factory proof of concept.
MIT reported a flight and landing trial without external motion capture. The prototype still used an external power supply.
A preview of the November 19–21 event describes coordinated Estun arms and a wheeled dual-arm robot.
The November 20–22 schedule includes sorting, precise insertion, palletizing, and quality reporting.
The organizer listed a November 14–15 tournament. For student teams, tracking repeatability between matches offers a useful engineering exercise.
The host reported 565 teams from 104 colleges and universities, with tracks including embodied AI, humanoids, and dexterous manipulation.
A firsthand report describes drink handling, tray delivery, and repeated grip adjustments during laundry sorting.
The launch covered model architecture, capabilities, and open-source plans. Its performance on a physical robot is a separate question.
ASUS says Gallop is learning an internal workstation. Customer pilots are planned.
The municipal industry agency outlines work on robotics capabilities and deployment.
The authors use Unitree A2-W as a common platform and introduce benchmark environments and initial research resources.
Developers can test pickup, drop-off and tracking in a sandbox. Live dispatch requires approval.
The company describes using actuator measurements in simulation and examining control on a wheeled experiment.
The authors bring piezoresistive, magnetic and vision-based tactile sensors into one representation.
Organizer plans for November 7–8 connect models, real hardware and application workflows; verified competition results are not claimed.
CIIE reporting describes distinct roles for Aptiv and Bosch rather than a universal push into complete robots.
November 8 reports describe cumulative production of Q1 and T1 robots, not 10,000 confirmed household deliveries.
A November 7 report shows a Hitch Open demonstration photographed on November 6.
Added November 7 from a November 3 announcement; first-generation specifications are not transferred to Gen 2.
A research report describes adding a truss bay in orbit; concept imagery, prebuilt hardware and completed work must be distinguished.
Agreements cover industrial validation and computing/power technology; plans do not establish completed delivery.
A November 6 manufacturer report reviews a November 2–3 trial; robot assessment counts are not task success rates.
Pick a first interaction, then check where the code runs and what each edition needs for power and connection.
Start with Gazebo and MoveIt 2, then check the controller, power and kit contents if you need hardware.
November 3 documentation review: model API and local-console paths still require supported hardware, setup and calibration.
Reviewed November 3: the organizer describes five scenario groups and 13 events. Planned testing is not a completed deployment assessment.
Separate hardware variants, interface access, software versions and simulation from physical-robot requirements.
Reachy Mini: select Lite or Wireless before comparing specifications
FR3, FR3 v2 and Panda: identify the model before configuring control
Why five DOF on OpenMANIPULATOR-X do not mean five arm axes
A source-reviewed guide to software versions, simulation and hardware entry points, with mapping and navigation resources.
G1 and G1 EDU: confirm access before choosing an SDK
没有机器人,能不能开始? 对于想进入机器人领域的开发者,购买硬件往往是第一道顾虑:机器人价格、传感器、维修和实验场地,都可能让一次尝试变得昂贵。 仿真提供了另一种起点:先在计算机中定义任务、运行控制程序、观察机器人行为,再考虑是否进入真实硬件阶段。 MuJoCo Playground 就是一
事件概述 2026 年上半年,中国人形机器人出货量超过 4 万台,全球占比约 97%。 行业评价体系正在从"能不能做"转向"能否稳定、经济地完成任务"。 量产能力成为这一阶段的主要竞争维度。 关键节点 - 8 月 19 日:宇树科技登陆科创板,从申购到上市仅用 9 天。 - 9 月 12
ZEPHASTRA COMMUNITY
Documentation, open-source tools and practical references.
Use a simulated capture to find missing frames, duplicates, and invalid action labels.
OFFICIAL DOCUMENTATION
Find references by task, then confirm versions and runtime requirements.
These are official links and usage notes, not republished documentation or claims that tutorials were executed.
Start with events, buttons and a display using the official MakeCode simulator.
Try basic programs in the browser first; physical downloads, peripherals and robot extensions have separate requirements.
www.microbit.orgExplore simulated buttons and sensor input for most micro:bit programs.
Not a full robotics dynamics simulator; it does not verify wiring, motors or driving behavior.
makecode.microbit.orgExplore apps, editions, SDK and simulation documentation.
Distinguish Wireless, Lite and Simulation; check each app’s model services, accounts and computer requirements.
huggingface.coOfficial ros2_tracing repository for execution events and performance investigation. Not run in this editorial review.
Architecture documentation from a fixed public project revision. Original project documentation may be in Chinese.
Public task reports, camera evidence and cancellation checks. These are not cross-device or real-hardware certification.
The November 16 announcement includes standards on intelligence grading, training, powered joints, and dexterous hands.
On November 19, Marubun announced a RealMan distribution agreement covering lightweight arms, data collection, and plans to mount arms on quadrupeds.
The official examples cover a basic model, PID, transmissions, and a mobile base.
Use the controller docs to distinguish commands, execution status, and hardware interfaces.
On November 17, Novares reported 200 cycles in one hour of autonomous operation during a Spanish factory proof of concept.
MIT reported a flight and landing trial without external motion capture. The prototype still used an external power supply.
A preview of the November 19–21 event describes coordinated Estun arms and a wheeled dual-arm robot.
The November 20–22 schedule includes sorting, precise insertion, palletizing, and quality reporting.
The organizer listed a November 14–15 tournament. For student teams, tracking repeatability between matches offers a useful engineering exercise.
The host reported 565 teams from 104 colleges and universities, with tracks including embodied AI, humanoids, and dexterous manipulation.
A firsthand report describes drink handling, tray delivery, and repeated grip adjustments during laundry sorting.
The launch covered model architecture, capabilities, and open-source plans. Its performance on a physical robot is a separate question.
ASUS says Gallop is learning an internal workstation. Customer pilots are planned.
The municipal industry agency outlines work on robotics capabilities and deployment.
The authors use Unitree A2-W as a common platform and introduce benchmark environments and initial research resources.
Developers can test pickup, drop-off and tracking in a sandbox. Live dispatch requires approval.
The company describes using actuator measurements in simulation and examining control on a wheeled experiment.
The authors bring piezoresistive, magnetic and vision-based tactile sensors into one representation.
Organizer plans for November 7–8 connect models, real hardware and application workflows; verified competition results are not claimed.
CIIE reporting describes distinct roles for Aptiv and Bosch rather than a universal push into complete robots.
November 8 reports describe cumulative production of Q1 and T1 robots, not 10,000 confirmed household deliveries.
A November 7 report shows a Hitch Open demonstration photographed on November 6.
Added November 7 from a November 3 announcement; first-generation specifications are not transferred to Gen 2.
A research report describes adding a truss bay in orbit; concept imagery, prebuilt hardware and completed work must be distinguished.
Agreements cover industrial validation and computing/power technology; plans do not establish completed delivery.
A November 6 manufacturer report reviews a November 2–3 trial; robot assessment counts are not task success rates.
Pick a first interaction, then check where the code runs and what each edition needs for power and connection.
Start with Gazebo and MoveIt 2, then check the controller, power and kit contents if you need hardware.
November 3 documentation review: model API and local-console paths still require supported hardware, setup and calibration.
Reviewed November 3: the organizer describes five scenario groups and 13 events. Planned testing is not a completed deployment assessment.
Separate hardware variants, interface access, software versions and simulation from physical-robot requirements.
Reachy Mini: select Lite or Wireless before comparing specifications
FR3, FR3 v2 and Panda: identify the model before configuring control
Why five DOF on OpenMANIPULATOR-X do not mean five arm axes
A source-reviewed guide to software versions, simulation and hardware entry points, with mapping and navigation resources.
G1 and G1 EDU: confirm access before choosing an SDK
没有机器人,能不能开始? 对于想进入机器人领域的开发者,购买硬件往往是第一道顾虑:机器人价格、传感器、维修和实验场地,都可能让一次尝试变得昂贵。 仿真提供了另一种起点:先在计算机中定义任务、运行控制程序、观察机器人行为,再考虑是否进入真实硬件阶段。 MuJoCo Playground 就是一
事件概述 2026 年上半年,中国人形机器人出货量超过 4 万台,全球占比约 97%。 行业评价体系正在从"能不能做"转向"能否稳定、经济地完成任务"。 量产能力成为这一阶段的主要竞争维度。 关键节点 - 8 月 19 日:宇树科技登陆科创板,从申购到上市仅用 9 天。 - 9 月 12